← All contributions
Indoor Solar Lights for Girls Dormitories

Indoor Solar Lights for Girls Dormitories

5th Batch | Led by Arun Gowda | ₹2.50 Lakhs

This project was undertaken by the 5th batch in association with Menda Foundation with a total cost of ₹2.50 lakhs.

Problem Solved: Power problems in girls’ dormitory during exam time due to frequent power failures.

The Alumni Association wishes the 5th batch, led by Arun Gowda, all the best for their continued support.